Jakarta – Bandung Highspeed Railway with total length of some 140 Kilometers is the first high speed railway in South East Asia. Consist of 4 sections and 4 stations, Bore Pile and Rigid Inclusion (CFG Pile) are applied to support the railway.
Rigid Inclusion (CFG Pile) is a ground improvement technique by constructing a composite foundation that consists of rigid columns. This method comprises of penetrating steel mandrel with Top Mounted Vibrator, fill with cement fly ash-gravel or low to mid grade (K150 or K200) concrete materials through funnel on top of pipe.
Location
West Java, Indonesia
Method
Bore Pile, Rigid Inclusion (CFG Pile)
Construction Start
May 2019